(Is this correct to use on a circuit feeding a 200 Amp main breaker?) Typically, your 2 hot leads are connected to the main breaker and the meter itself. 0000002177 00000 n GENERAL NOTES: • Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and miscellaneous mounting hardware furnished and installed by customer. 0000008625 00000 n Pierre C Belarge Senior Member. FREE Shipping. This is going to be burried most likely in conduit and none of it will be indoors and will probably be THHN aluminum. 6 Answers. Only 17 left in stock - order soon. Hence the comment regarding the power company earlier. 4.7 out of 5 stars 22. Thanks again. I will scrap the other 100 amp service to the shop and install a brand new service there that is in no way connected the the current 200 amps. 0000001016 00000 n Installing a 200 amp Service Line. 0000023057 00000 n 0000018853 00000 n Please update us with more information, and we can assist you further. But always make sure you are working with unenergized wires. Square D by Schneider Electric UHTRS223A 200A Ringless Underground Meter Socket With Horn Bypass. Secure the 200 amp Square D panel between two wall studs using the supplied screws. I am not sure what size wire to use. 0000017093 00000 n Feed the SE cable through the hole in the wall and then screw the meter socket to the exterior of the house. In your situation you can just add a 100 amp panel and use the 320 amp or what I call a 400 amp meter base. 1 decade ago. Answer Save. I am assuming that by 200 amp service you mean a load that may require 200 amps at some stage?. FREE Shipping by Amazon . What Gauge of Wire do I use from meter Box to Breaker Box in house? The neutrals and grounds have their own lugs for connection. Also if you break the seal on the meter the utility company can charge you. The load side of the electric meter, which carries power to the main service panel, can be wired either directly to the panel or to an interim disconnect. I have 400 amp pedestal meter at the front of my property with two 200 amp services on the other side of the panel I want to get 200 amp service to a house I'm building 240 feet away what size wire … Install the new PVC weather head and conduit to the exterior wall, directly above the meter socket. 0000017522 00000 n 0000032373 00000 n Most electricians will tell you that a permit needs to be pulled in order for you to do this. SERVICE PANEL SIZE IN AMPS REQUIRED MINIMUM SIZE OF ENTRANCE CABLE IN MAST AND METER BASE; COPPER ALUMINUM; 200: 2/0: 4/0: 150: 1/0: 3/0: 100: 1: 1/0: Two 5/8-inch x 8 feet copper or copper clad grounding electrodes must be supplied with a #4 copper or larger grounding conductor spaced a minimum of 6 feet apart. ON THE METER  THE NUETRAL AND GROUND ARE CONNECTED THRU THE BUS, AND ON THE INSIDE BREAKER BOX  THE NUETRAL IS HOOKED TO THE NUETRAL, BUS BUT DOES THE GROUND HERE HOOK TO THE BOX WITH A WIRE HOOKED  TO. A 200 amp is rated 160 amp continuous and 200 non continuous. Ground wire at house meter loop shall extend to weatherhead with appropriate bonding at meter base and electrical panels. Location Westchester County, New York. 0000033226 00000 n Relevance. Attach a length of 200-amp SE electrical cable to the new meter socket. Depending on the service drop wire size leading to the meter, if it is rated for more than 200A you may be able to upgrade the existing 200A service (meter/meter base) and then install more than 200A in combined main breaker capacity for the two usage areas. Not to mention location of meter and new panel certain things may be required, like proper ground rod, bonding on conduit and load center etc. 0000001359 00000 n And as always, you can refer to a local licensed electrician to find out more information, like local codes. 0000002593 00000 n The right panel does not have this connection back to the meter base. 0000001825 00000 n In stock on February 8, 2021. 3. You need to contact an electrician, if you don’t know of one contact your utility company. I need to know the type of service wire I need (how many exactly, 3 or 4?) 0 1. sparky8786. If allowed, the local code will also tell you how much it can be reduced. Need wiring diagram for meter to breaker with 4 wires. And make sure your homeowners insurance is paid up. • Installation available for services greater than 200 amperes but less than 320 amperes continuous. Step 14 Insert the breakers removed from the 100-amp breaker box. Considering that there are well over a dozen different manufacturers and makes of meters and breaker panels in the industry, I can't provide you with specfic information unless you show or tell us what components you are dealing with. SINGLE PHASE, THREE WIRE 400 AMP SERVICE A. In fact, I would suggest contacting your power company to ensure you are okay'ed to do this. To size the wire you must know the amerage of the main breaker. The sub-panel will be 100' from the main and will feed the kitchen, great room, 1/2 bath and the garage/garage shop. With that said, you might want to take a look at this document. 0000017056 00000 n Use a torpedo level to ensure the socket is level. 3.1.2 Approved for use: Milbank Catalog Number 200 Amp U5168-XTL-200-KK DENOTES REVISION NORTHERN INDIANA PUBLIC SERVICE COMPANY. 0000029703 00000 n Failure to do this means you are working illegally with the power company's property, and you'd be working with live wires. Install the new panel and replace the mounting bolts. 0000001903 00000 n While I realize that you probably are working with one that was already there....you can provide us with the brand name or upload an image so we can tell you where each leg can go. and two 200 amp panels that is common as well due it cheaper than order a large single 400 amp panel and put a subpanel next to it. for a 200 amp service you need a# 3ort size wire according to electrical code,#4 for aluminum.for the ground cable you need a size #4 wire,number 2 wire is used for 175 amps, where do you guys get your code books from.